TasWater – Isandula Dam Access Road

Scroll down to content

Giraffe Civil Contracting were awarded the tender for the construction of TasWater’s  Access Track to the bottom of the Isandula Dam, Ulverstone TAS

The access track was to meet all Forestry Tasmania’s codes of practice, making what was in some places a 60% gradient hill-side into a desired gradient of 15-20%  by cutting and benching our way to the bottom.

 

 

IMG_0040IMG_0039IMG_0038IMG_0032