Timberlands Pacific – Timber Bridge Replacement Program

Putting Giraffe Civil Contracting’s civil engineering and forestry knowledge and experience together we have built a great relationship with Timberlands Pacific in the removal of old timber bridges to then fabricate and install new counter levered concrete bridges designed by Giraffe Civil Contracting, certified by Dale Luck & Associates.

Timberlands have replaced 10 expired timber bridges with existing load limits in the past 3 years with this steel and concrete design.

 